An Australia wide guide to three phase power Always hire a licensed electrician
Resources

Straight answers about power, switchboards and cooling.

Most people only think about their electrical setup when something trips, flickers or fails. These guides cover the questions readers ask most, written in plain English so you can make a confident call before you spend a cent. This is a guide and not a substitute for advice from a licensed electrician.

A three phase switchboard like the one you may find in a home, workshop or small business.

In plain English

Guides worth reading before you book a job

Each one covers a topic that comes up often, with the warning signs and trade-offs spelled out.

Guide

Single phase vs three phase: which does your property actually have?

Many homes run on a single phase supply, which is why the ducted system someone wants may not be possible without an upgrade. This guide walks through where to look on your switchboard, what the meter box tells you, and the loads that often force the change.

6 min read · Residential · Read about three phase upgrades
Guide

Five signs your switchboard needs replacing, not just a reset

Old ceramic fuses, a board that is warm to touch, or a main switch that trips whenever the oven and dryer run together are all clues the board may be past its use-by date. This guide lists the signs that mean a switchboard upgrade may be the safer, cheaper long-term fix.

4 min read · Safety · Read about switchboard upgrades
Guide

What ducted air conditioning really costs to run in an Australian summer

This guide breaks down the running costs of a mid-sized ducted system across a typical January, what zoning does to your bill, and the thermostat mistakes that quietly add hundreds to a quarterly invoice.

5 min read · Air conditioning · Read about ducted air conditioning
Guide

EV chargers, solar and the load your switchboard can handle

Adding a 7kW car charger on top of solar and an existing air conditioner can push a single phase supply to its limit. Here is how a load assessment works and when three phase may be the smarter path.

6 min read · Upgrades · Ask about load assessments
Home safety

A five-minute electrical check anyone can do

You do not need a multimeter to spot trouble. Run through this list once a season.

  • Look for scorch marks, discoloured plastic or a burnt smell around power points and light switches.
  • Check that safety switches (RCDs) trip when you press the test button, then reset them.
  • Feel the front of the switchboard with the back of your hand. It should be cool, never warm.
  • Confirm outdoor power points and garden lighting have weatherproof covers that seal properly.
  • Notice any light that flickers only when a large appliance starts, which can signal a loose neutral.
  • Make sure the safety switch labels inside the board still match the circuits they control.

If any of these fail, stop using the circuit and contact a licensed electrician rather than opening the board yourself. Mains power is not a DIY item. Always check the electrician's licence number before any work begins.

Red flags

Symptoms that mean call someone today, not next month

Australian summers put real strain on older wiring and air conditioning. These signs rarely fix themselves.

  • Buzzing or humming from the switchboard. Often a failing breaker or a loose connection heating up behind the panel.
  • A safety switch that will not stay reset. Something on that circuit may have an earth leakage fault, and repeated resets can mask a genuine hazard.
  • Lights that dim when the air conditioner kicks in. Often a sign the supply or circuit is undersized for the load.
  • Warm power point faceplates. A loose termination can create resistance and heat.
  • An air conditioner that trips the breaker on start-up. Often a compressor or capacitor fault, and it will not improve on its own.
  • Burning plastic smell near the meter box. Turn the main switch off if it is safe to reach and contact a licensed electrician.
What to expect

From your first call to a completed job

Here is what a typical process with a licensed electrician can look like.

01

Phone chat and rough scope

Describe what is happening and the electrician can advise whether it sounds like a repair, an upgrade or something that needs an on-site assessment. Ten minutes on the phone can save a wasted call-out.

02

On-site inspection and written quote

The electrician tests the circuits, photographs the switchboard and checks your supply type. You should receive a written quote with the scope, the parts and the compliance work listed separately.

03

Booking and installation

Once you approve the quote, a date is locked in. Most switchboard and three phase upgrades are done in a single day with power restored before the electrician leaves.

04

Testing and paperwork

Every job is tested, and you should receive the relevant electrical safety paperwork for your state or territory before the electrician packs up.

Quick reference

Terms you may hear, defined

Skip the jargon. Here is what the common terms on a quote can actually mean for your home or business.

Still not sure what your property needs?

Ask a licensed electrician to assess your switchboard and supply type. They can tell you whether it is a simple fix or something bigger, based on the place itself.

Read the full guide